Beach Energy aimed to electrify its Lang Lang Gas Plant (LLGP) to transition from gas-powered generators to a more sustainable, reliable electricity-based system. This project was crucial for reducing operational costs and aligning with Beach Energy’s sustainability goals.
The LLGP Electrification project faced significant challenges, particularly during the Front-End Engineering Design (FEED) phase. The initial solutions proposed were unworkable, necessitating a realignment of the project. Additionally, securing a reliable connection to AusNet LLG13 feeder required navigating complex technical and contractual processes, risking delays.
Beach Energy
Lang Lang, VIC
Project Delivery Services
OGP’s team played a definitive role in managing the project back on track by providing the following services:
OGP’s strategic project management and stakeholder engagement were crucial in the successful execution of the Lang Lang Gas Plant Electrification project, helping Beach Energy achieve its sustainability and cost-efficiency goals. Our involvement during FEED secured a viable solution and set the project up for success. Parallel processing of Ts & Cs with the survey minimised potential delays and Built-in contingencies ensured readiness for any cost variations.
OGP was engaged by Laing O’Rourke to support the first phase of Rio Tinto’s Gudai-Darri project, a $3.5 billion iron ore mine in the shire of East ...
LPG Bullet Reconfiguration Project at the Otway Gas Plant is located near Port Campble VIC. OGP team was engaged to address the challenges of incre...
Beach Energy aimed to electrify its Lang Lang Gas Plant (LLGP) to transition from gas-powered generators to a more sustainable, reliable electricit...
The Blue Energy Gas Well Project is located in Coppabella QLD. OGP was engaged to develop a Concept Design and final Detailed Design for the 4 late...