The Australian Energy Market Operator (AEMO) reviewed the secondary design concepts proposed by AusNet for the Sydenham Terminal Station (SYTS) and the new Bulgana Terminal Station (BGTS). AusNet had proposed adopting IEC 61850 instead of a conventional secondary system.
AEMO
Melbourne, VIC
Engineering Services
OGP Group was engaged by AEMO to perform the following:
OGP provided AEMO with the confidence that AusNet’s proposed implementation of IEC 61850 was fit for purpose, enhancing the reliability and resilience of the proposed assets, while ensuring that AEMO would face no risk in fulfilling their obligations as the Market Operator with the adoption of digital IEC 61850-based substations.
The TOYOTA facility in Altona VIC is replacing it’s r main 22kV intake substation switchgear, protection, control and auxiliary equipment, which ar...
The Australian Energy Market Operator (AEMO) reviewed the secondary design concepts proposed by AusNet for the Sydenham Terminal Station (SYTS) and...
OGP was engaged by Service Stream to increase the capacity of AusNet gas network, which is serviced by the field regulator at Buckley Grove, Moolap...
Service Stream engaged OGP to carry out the detailed design for the Sky Road pipeline extension project on behalf of AusNet Services. The scope of ...