OGP was engaged by Service Stream to increase the capacity of AusNet gas network, which is serviced by the field regulator at Buckley Grove, Moolap, Geelong. The project required expanding the gas capacity to 16,000 sm3/h to provide additional supply to the eastern sections of the Geelong distribution network.
Services Stream
Melbourne, VIC
Engineering Services
OGP provided a comprehensive solution for the project, delivering the following key services:
Our comprehensive engineering and project management solutions, from design to supplier evaluation, were vital in the success of this project, both for OGP Group and for AusNet Services. We faced challenges unlike any we had encountered previously, but our ability to overcome them without delays is a testament to our commitment to innovation and development.
The TOYOTA facility in Altona VIC is replacing it’s r main 22kV intake substation switchgear, protection, control and auxiliary equipment, which ar...
The Australian Energy Market Operator (AEMO) reviewed the secondary design concepts proposed by AusNet for the Sydenham Terminal Station (SYTS) and...
OGP was engaged by Service Stream to increase the capacity of AusNet gas network, which is serviced by the field regulator at Buckley Grove, Moolap...
Service Stream engaged OGP to carry out the detailed design for the Sky Road pipeline extension project on behalf of AusNet Services. The scope of ...