Utilities

Utilities Projects

HV Intake Substation Replacement Project

The TOYOTA facility in Altona VIC is replacing it’s r main 22kV intake substation switchgear, protection, control and auxiliary equipment, which ar...

AS 61850 Technical Study

The Australian Energy Market Operator (AEMO) reviewed the secondary design concepts proposed by AusNet for the Sydenham Terminal Station (SYTS) and...

Buckley Grove Field Regulator Replacement Project

OGP was engaged by Service Stream to increase the capacity of AusNet gas network, which is serviced by the field regulator at Buckley Grove, Moolap...

Sky Road Gas Main Pipeline Extension Project

Service Stream engaged OGP to carry out the detailed design for the Sky Road pipeline extension project on behalf of AusNet Services. The scope of ...