AusNet Services was looking to increase the gas supply capacity for its distribution network (specifically at Moolap, Hoppers Crossing, and New Gisborne).
AusNet
Victoria
Engineering Services
OGP Group was engaged to assist by:
Regarding New Gisborne upgrade, OGP Group identified a more cost-effective solution to enhance the gas network’s capacity. AusNet Services reviewed and accepted this recommendation as the preferred approach for the upgrade. Consequently, the Design & Construct Scope of Works was modified to align with this new upgrade strategy.
OGP Group’s comprehensive engineering solutions, particularly in identifying a more cost-effective method for our client to achieve their objectives, were crucial to the success of this project. This outcome reflected our commitment to excellence in critical infrastructure development.
The TOYOTA facility in Altona VIC is replacing it’s r main 22kV intake substation switchgear, protection, control and auxiliary equipment, which ar...
The Australian Energy Market Operator (AEMO) reviewed the secondary design concepts proposed by AusNet for the Sydenham Terminal Station (SYTS) and...
OGP was engaged by Service Stream to increase the capacity of AusNet gas network, which is serviced by the field regulator at Buckley Grove, Moolap...
Service Stream engaged OGP to carry out the detailed design for the Sky Road pipeline extension project on behalf of AusNet Services. The scope of ...