The Goonumbla Solar Farm, with an export capacity of approximately 75MVA, is located 10km west of Parkes, NSW. OGP Group was engaged by the EPC contractor, to support them by acting as their engineering representative during construction.
GRS
Parkes, NSW
Owner’s Engineering
In fulfilling the client engineering role, our team handled a variety of responsibilities:
Leveraging our technical and commercial expertise, OGP successfully delivered the project scope while effectively managing unforeseen scope variations related to the installation of the capacity banks and switchgear. As a result, our client experienced reduced schedule impacts and minimised cost overruns.
The Emeroo renewable facility is a 40MW BESS (battery energy storage system) located in Emeroo, South Australia. The system is grid connected and u...
The Pelican Point Combined Cycle gas turbine site located in Outer Harbour, SA was the focus of a project for which Engie participated in the SA Go...
The Willogoleche Wind Farm is located approximately 200km north of Adelaide, SA, comprising of 32 turbines generating a combined generation output ...
The Goonumbla Solar Farm, with an export capacity of approximately 75MVA, is located 10km west of Parkes, NSW. OGP Group was engaged by the EPC con...