Project Background

The Lilyvale Solar Farm is a single axis tracking solar farm with an export capacity of 100MW located in Emerald, QLD. OGP provided an integrated engineering and project delivery team to assist the EPC contractor with the engineering and design review of their electrical design, civil and structural engineering validation for the plant including project delivery support. Additionally, we offered technical support to ensure compliance with requirements of the Australian Energy Market Operator (AEMO) and the transmission network service provider (TNSP).

Client:

Location:

Emerald, QLD

OGP's Role:

Integrated Engineering & Project Delivery

The OGP Solution

Our in-house team was involved in several ways, which contributed to the tracking structure for the farm. This includes:

  • Specification/review of the 33kV switchroom, harmonic filters, switchboards, RMUs, and transformers.
  • Engineering and Design of the HV fault Limiter and Neutral earth reactor.
  • Design and testing of the earth grid.Review the short circuit study and protection settings.
  • Procurement and logistics management, including expediting major equipment delivery.
  • Commercial negotiations and contract administration of major construction work packages for civil, mechanical and electrical.
  • Management of construction and commissioning teams.Project scheduling and cost control.
  • Technical support for interfacing with AEMO and the TNSP.Contract review and tender management.RPEQ validation of the EPC’s detailed design.

    The Outcome

    By conducting a thorough review of the project’s short circuit studies, OGP identified that the future prospective short circuit rating could potentially exceed the 33kV switchgear rating. To address this issue, we designed, procured, and managed the installation of a fault limiter.

    Our team also successfully navigated the project’s technical, budgetary, and scheduling challenges, along with the environmental and labour hire challenges inherent to such a remote site.

    Recent Projects

    EMEROO BESS – Electrical Studies

    The Emeroo renewable facility is a 40MW BESS (battery energy storage system) located in Emeroo, South Australia. The system is grid connected and u...

    SA Battery Tender Project

    The Pelican Point Combined Cycle gas turbine site located in Outer Harbour, SA was the focus of a project for which Engie participated in the SA Go...

    Willogoleche Wind Farm Project

    The Willogoleche Wind Farm is located approximately 200km north of Adelaide, SA, comprising of 32 turbines generating a combined generation output ...

    Goonumbla Solar Farm Project

    The Goonumbla Solar Farm, with an export capacity of approximately 75MVA, is located 10km west of Parkes, NSW. OGP Group was engaged by the EPC con...