The Yuri PV/BESS/H2 upgrade project is situated near the existing Yara Fertiliser Plant in Pilbara, WA. In collaboration with SEPCOIII, OGP Group was invited as the design partner for the Engineering, Procurement, and Construction (EPC) tender. This project involved an 18MW Solar PV facility, a 4MWh/8MW Battery Energy Storage System (BESS), and a 10MW H2 production facility.
ENGIE
Pilbara, WA
EPC Engineering & Design
Our in-house engineering and project delivery team played significant role in contributing to the Yuri project upgrade. This included:
OGP was one of the two preferred bidders in the competitive tender process. Our comprehensive engineering and project management solutions, from design to optimisation to tender evaluation, played a pivotal role. This outcome reflects OGP's commitment to innovation and excellence in the fields of renewable energy and critical infrastructure development.
The Emeroo renewable facility is a 40MW BESS (battery energy storage system) located in Emeroo, South Australia. The system is grid connected and u...
The Pelican Point Combined Cycle gas turbine site located in Outer Harbour, SA was the focus of a project for which Engie participated in the SA Go...
The Willogoleche Wind Farm is located approximately 200km north of Adelaide, SA, comprising of 32 turbines generating a combined generation output ...
The Goonumbla Solar Farm, with an export capacity of approximately 75MVA, is located 10km west of Parkes, NSW. OGP Group was engaged by the EPC con...